OLG - First Christmas Decorations
|
|
 |
OLG - Dec. 13, 2011 - Closing Ceremony 40 Hours Devotion
|
|
 |
OLG - 11/27/2011 - Installation of Extraordinary Ministers
|
|
 |
OLG Blessing of The Time Capsule Sep 11, 2011 |
|
 |
OLG First Wedding Aug 27, 2011 |
|
 |
OLG - June 26, 2011 - First Corpus Christi Procession |
Msgr. Gentili,
Msgr. Mortimer and Transitional Deacon Ianelli, along with hundreds
of parishioners processed around the perimeter of the new Our Lady
of Guadalupe Church building. |
 |
OLG - June 26, 2011 - 1st Baptism in new Church |
Presided over by
Transitional Deacon Bob Ianelli and Msgr. Joseph Gentili. |
 |
OLG June 14, 2011 |
The first daily
mass was con-celebrated at the main church altar, considering the
chapel was not yet ready. Celebrating with Msgr. Gentili is Msgr.
Jim Burke, a visiting priest from the Archdiocese of Newark and Fr.
Michael Tawelko, from Our Lady of Good Council parish. |
|
|
OLG June 11, 2011 |
Dedication
of Our Lady of Guadalupe Roman Catholic Church. Cardinal Rigali
blessed and sanctified our new Church with several Bishops,
Monsignors and priests, as well as over 1200 parishioners in
attendance. Two relics were placed within the Altar and Cardinal
Rigali washed and purified the Altar. |
 |
OLG June 10, 2011 |
Preparation is
being made for the dedication of our new church. Several men and
women helped in moving the sacramentals from the rectory, as well as
cleaned pews, moved chairs into place and in general prepared the
church for the 4 PM celebration on Saturday, June 11, 2011. Anthony
Visco installed the mural of the Crucifixion within the retalblo and
George Sisti installed the frame and mural of Our Lady of Guadalupe
in the Shrine. |
  |
OLG June 7, 2011 |
New stained glass
being installed in windows on each side of altar. Wrought iron
framing installation nearing completion and the pews are now being
installed permanently. Confessional booths are now installed on each
side of the Shrine. The choir, under the direction of our Director
of Liturgical Music, Paula M. Furman, was in rehearsal for the
dedication ceremony on Saturday evening. |
  |
Organ Installation |
These photos were
taken by Dennis Grafton at the time the organ was being raised up
and onto the choir loft. |
|
  |
OLG June 1-3, 2011 |
Wrought iron
structure is in the process of being installed at the four corners
of the nave. Eventually stained glass will be placed inside the
structures. Pews are assembled and as soon as the floor is cleaned,
the pews will be properly placed and secured. Construction continues
in the chapel and the door frame at the entrance is in place, as is
the foundation for the altar. Arched columns at the entrance to the
narthex are completed and the workmen are in the process of pouring
concrete at the entrance. Landscaping is being done in the area
where gardens will be planted. Bathroom fixtures are now installed. |
  |
OLG May 25, 2011 |
The pews are
finally being installed. In the sanctuary the lectionary is now in
place and final touches are being made on the altar. The view from
the front of the Church shows the completed archways.....and then
there is the master director himself....Monsignor Gentili. |
 |
OLG May 18, 2011 |
The
arches at the entrance continue to be worked on. In the sanctuary the marble
altar is in place, the retablo is nearing completion and the stations of the
cross frames are in place and electricity is being connected to each one.
The marble floor continues to be installed and is nearing completion. Te
entrance from the narthex to the nave is being framed out and will have
glass and doors installed soon. |
|
 |
OLG May 11, 2011 |
The Retablo has now been installed in the Sanctuary and the installation of
the marble floor continues in the Nave. The elevator to the choir loft is in
the process of being installed, the archways at the entrance to the Narthex
is nearing completion, and the bell tower and cupola have now been
completed. Doors are now hung throughout the Church building. |
 |
OLG May 7, 2011 |
Construction is progressing rapidly now. Doors have been installed
throughout the Church. Columns at the entrance to the Church are having a
facing of concrete blocks installed, and the start of arches at the entrance
has begun. The bell tower now has louvers over all the oprnings and the roof
on the Chapel has been completed. Marble floor tile installation continues
and now almost the entire floor in the main portion of the Church has been
completed. Stained glass has been installed in the window directly over the
Altar. A metal, filigree railing has been installed on the Choir loft.
Cabinets are being installed in the utility areas such as the kitchen and
changing rooms. On the exterior landscaping continues with the planting of
trees and shrubs on the Cold Spring Creamery side of the Church, continuing
around the corner of Durham Road, and a paving stone walkway is being built.
Workmen are preparing to install lighting throughout the parking lots and
exterior of the Church. |
 |
OLG May 1, 2011 |
Construction is moving along well throughout the Church building. The tile
roof is completed on the Chapel and drywall is nearing completion inside.
Drywall has now been completed and parts of it painted in the main portion
of the Church. Marble tile installation has been completed rom the Chapel
across toward the Shrine and should be completely finished by the end of the
week. The bathroom partitions and stalls have been installed and doors are
being hung. Plywood panels protecting the stained glass in the cupola have
been removed and spot lighting has been installed throughout the Altar area.
Marble installation continues around the Altar, as well. The columns at the
entrance to the Church are being enclosed with the stone facing. |
 |
OLG Apr 26, 2011 |
The
roof of the Chapel is nearing completion. On Saturday I went into the Church
around 4 PM; the drywall and floor tile workers were busy. I spoke with one
of them and asked if they were about finished for the day. He said they were
the second shift that started at 3 PM and were going to continue to work
until 1 AM.....Obviously Adams Bickel is making every effort to have our
Church ready for the dedication on June 11. The photos show drywall nearing
completion throughout. Floor tile have been laid in more than half of the
Church and the chandeliers have been installed. Additional work is being
done on and around the Altar. The columns at the front entrance are being
cinder blocked in preparation for the stonework. |
  |
OLG Apr 23, 2011 |
Last Easter Altar Decorating at CB EAST |
|
 |
OLG Apr 17, 2011 |
Most of the changes taking place are on the interior of the Church. Drywall
continues throughout, electrical work, including the beginning of
installation of the ceiling lights and audio, marble facing on the Altar are
all being worked on. The start of installing roof tiles on the Chapel has
begun. |
  |
OLG Apr 11, 2011 |
Workers are busy trying to complete the Church in time for the June 11
dedication. The marble floor is being installed throughout the main area of
the Church, drywall continues to be installed throughout, the sound system
is being installed, marble surrounding the Altar and Sanctuary is being
installed, windows over the Shrine to Our Lady of Guadalupe are being
prepared for the stained glass installation, and workmen are busy completing
the installation of tiles on the roof. Workmen on the exterior continue to
complete the stonework and grading has been done prior to the blacktop being
installed. |
 |
OLG Apr 4, 2011 |
Marble continues to be in the Altar area . Tiles are beginning to be
installed in the main area of the Church and the stained glass has been
installed over the Altar. The concrete floor has been completed in the
Shrine of Our Lady of Guadalupe and dry wall installation will begin soon.
Dry wall continues to be installed throughout the Church now. The driveway
leading to front of the Church has been paved and the light fixtures are
nearing installation throughout. |
 |
OLG Mar 26, 2011 |
The bell tower is nearing completion, preparation for the roof tiles is in
place, stained glass continues to be installed above the Altar and grading
is being done for the floor in the Shrine to Our Lady of Guadalupe. Drywall
continues to be installed throughout the Church and tiles are being laid in
the Narthex. |
  |
OLG Mar 19, 2011 |
Exciting things are going on inside the Church. The temporary doors to the
Narthex and Chapel have been removed and dry wall is being installed in both
the sections. Stained glass is being installed over the Sanctuary and white
marble has been installed on the Altar. Stonework continues to be installed
on the bell tower and roof tiles on the main portion of the Church is
nearing completion. Preparation for the roof tiles on the Chapel continues,
as well. |
  |
OLG Mar 8, 2011 |
Brick
facia is being applied to the bell tower and roof tile continue to be
installed throughout. Wall board is being installed inside the cupola.
Marble is being installed on the main Altar surface as well as the steps.
Tile floor has been installed in the bathrooms and more wall board is being
installed throughout. |
  |
OLG Feb 26, 2011 Update |
Roof
tiles have been installed on the cupola, work continues in the Sanctuary and
additional marble is being installed on the Altar steps. The sprinkler
system is being installed throughout the interior of the building and tile
work is in progress in the bathrooms. |
  |
OLG Feb 20, 2011 Update |
Work continues on the Chapel, Shrine, and
Sanctuary. Views of the Sanctuary show marble beginning to be installed
along the steps of the Altar. View of the cupola from below shows that
drywall has been installed in preparation for completion. Views of the
Church from the choir loft show work to date on the entrance to the Chapel,
as well as the view of the Sanctuary and Shrine. Tiles continue to be
installed on the roofs of the Church building, bell tower and cupola. There
is also a view of the entire Church building as you will see it as you walk
from the parking areas. This will be updated weekly so you can see the
progress that is being made, and also will be printed on the cover of the
bulletin each week. |
 |
OLG Feb 9, 2011 Update |
The roof on the Chapel is nearing completion
both outside and inside. Stained glass windows have been installed inside
the cupola, and the concrete has been laid for the first level of the
Sanctuary & Altar. |
   |
OLG Jan 29, 2011 Update |
Major activity taking place at the Church
site: Chapel roof, walls and ceiling are being put into place, Sanctuary
area continues to take shape and concrete will soon be installed for Altar.
The cupola has been framed out on the interior. View three photos taken from
choir loft of the entry to the Chapel (left), Sanctuary (center) and Shrine
area (right). Snow storm and freezing weather, along with freezing rain has
not deterred the construction crew from work. |
 |
OLG Jan 22, 2011 Update |
Construction continues in the Chapel, as can
be seen with the walls being erected, and the wood beams and ceiling being
put into place. The dressing and storage rooms have been dry walled and
almost completed. With the two crosses in place and the roof being installed
throughout (in spite over temperatures some days in single digits and snow
on other days, the exterior of the Church is on schedule for completion
soon). The Altar continues to be constructed and the gravel base is being
poured in preparation for the concrete floor. Note the panorama photos show
a view of the Altar taken from the choir loft. The second photo is the view
from the Altar toward the entrance. |
  |
OLG Jan 20, 2011 Update |
In just a couple of days progress in the
construction in every area of the Church building can be seen. Roof tiles
are being installed on the main roof areas as well as the bell tower. Note
also, the progress being made on the Chapel; rafters, joists, wood interior
ceiling and walls all are being built at the same time. Look for the Altar
area to be nearing completion soon. |
  |
OLG Jan 17, 2011 Update |
The Cross was installed atop the cupola today
indicating that the construction of our Church building is moving along
quite well in spite of the weather. Also note that the trusses and steelwork
have begun to be installed on the Chapel. We can finally see our Building
nearing completion. |
  |
OLG Jan 11, 2011 Update |
The bell tower is now prepared for the
exterior to be completed. Roof tiles continue to be installed, in spite of
the weather. Work on the Chapel continues and walls are being created. The
Sanctuary is under construction and the Altar is beginning to take shape. |
  |
OLG Jan 4, 2011 Update |
The exterior bell tower is being fitted out
giving a better idea as to how it will finally look once the exterior is
completed. Also, the roof tiles have continued to be added, once again
giving a better idea of what the Church will look like when it is finished.
The choir loft is being finished-out with wood trim and the Altar area is
being constructed, initially with cinder block. |
  |
OLG Dec 24, 2010 Update |
|
  |
OLG Dec 22, 2010 Update |
The bell has been installed in the tower,
windows continue to be installed throughout the Church building and roof
tiles are starting to be installed.
|
  |
OLG Dec 11-18, 2010 Update |
Bronze colored metal and window framing being
installed on cupola. Windows are being installed throughout building.
Construction of the Altar has begun. Temporary doors are in place from
Narthex to the main area of the Church in order to retain heat in the area.
Exterior stonework nearing completion on the main portion of the Church and
Chapel. |
  |
OLG Dec 8, 2010 Update |
Work continues inside: setting studs for
walls, pulling electrical wiring and AVAC ductwork. |
|
  |
OLG - December 1, 2010 -Msgr Gentili donates Flag |
Monsignor Gentili donates township flag to
the Buckingham Township supervisors |
  |
OLG Nov 21, 2010 Update |
Work continues on the interior as well as the
exterior of the Church. Walls continue to be created using studs. The cupola
has now been framed out, insulated, and prepared for the exterior facing.
The area around the Altar is now being prepared for the concrete floor. The
choir loft now is studded out for stadium-like seating, as well as the
organ, as seen in several views. Preparation for the Altar area can be seen
in views taken from the choir loft. On the exterior of the building
stonework being installed enhances the brick facing and is nearing
completion. The is also a view of the parking areas having been paved. |
  |
OLG Nov 14, 2010 Update |
Stonework around the perimeter of the
building continues and is nearing completion. The parking areas continue to
be paved. Roof insulation is installed and the installation of the roof
tiles should begin soon. On the interior of the building studding for walls
continues and utility wires and pipes are being put in place, as well as the
HVAC ductwork. The walls for the Chapel are up and the steel for the roof
should begin to be installed sometime soon. |
  |
OLG Nov 7, 2010 Update |
Insulation on the roof continues, as does the brick and stone work on the
exterior of the Church. Much of the work being done now is in the interior;
walls are being created, duct work and plumbing and electric are being
installed. Views from the entrance and center of the Church interior, as
well as another photo of the Altar area from the choir loft area are shown.
There is another view of the Church from the parking area, as parishioners
will see the Church when arriving for Mass. |
  |
OLG Oct
31, 2010 Update |
Stonework on exterior continues, as seen
in the photos of the portion of the Church facing Rt. 413 (Durham Road).
HV/AC ductwork is being put in place and
studs for interior walls are being erected. Chapel walls are in place and
ready for the roof to be installed. Note the photos from the choir loft
toward the Altar. |
  |
OLG Oct
23, 2010 Update |
Paving of
driveways from Durham Road and Cold Spring Creamery Road and parking areas
has begun. Original concrete walkway has been replaced and the plantings on
each side have been restored. Installation of stonework on exterior of
building continues with second type of stone being installed. Concrete has
been poured in the choir loft and chapel. Insulation is being completed on
roof in preparation for installation of shingles. |
|
  |
OLG Oct 4, 2010 Aerial Photos |
Aerial
Photos taken by Rev. Mr. David Friel from a plane piloted by his father. |
  |
OLG Oct
11, 2010 Update |
In the
past 9 days several areas have been worked on: Interior ceiling is
completed, exterior stonework continues to be worked on, the Chapel walls
are nearing completion, and plumbing and electrical wiring is being
installed. The workmen have been at the site, weather permitting, 6 days a
week in order to complete the Church on schedule. |
 |
OLG Oct
2, 2010 Update |
Construction continues within the Church
building, in spite of the heavy rain this week. The ceiling is nearing
completion and the stairway to the choir loft is nearing completion.
Erection of the walls for the Chapel continues when the weather permits, as
well as the stonework on the exterior of the building. |
 |
OLG
Sept 25, 2010 Update |
Walls are being completed for the Chapel and roofing is being
installed throughout the Church. Stone and brick facing materials continue
to be installed, as is the wood ceiling throughout the interior of the
Church. |
|
  |
OLG Golf Outing Fall 2010 |
Thank you to all who participated in this fun fundraiser!! |
 |
OLG
Sept 15, 2010 Update |
The cupola (all 19,000 lbs) was raised and placed in position
on the Church. A cross will be placed on top within the next few days. Msgr.
Gentili and Deacon Gohde were there to celebrate and bless this special
occasion. Note the stonework going on throughout the building, in addition
to the wood base being placed on the roofs. The balance of the parking areas
have new curbing and are graded in preparation for the crushed stone and
asphalt. This truly was a SPECIAL day for Our Lady of Guadalupe. |
 |
OLG
Sept 9, 2010 Update |
In the past 10 days an amazing amount of work has been
accomplished: Roof work at the entrance is nearing completion, metal studs
have been installed along most of the Church building, including around the
altar, insulation is being placed over the studs, The cupola has been built
and awaiting installation. In addition, the Chapel walls are being built and
woodwork in the ceiling of the Church is being installed, as is the flooring
for the choir loft. Progress continues to be made with the stonework
installation on the exterior of the building. And be sure to note the Cross
atop the bell tower. |
 |
OLG
August 28, 2010 Update |
Exterior stonework under way. Steel studs continue to be
installed. Views from all sides show extent of work being done. Views of
interior are taken as panorama. View in succession to get and idea of what
we will be looking at from inside the Church, facing the Altar. Final photos
of the exterior facing from Rt. 413 toward the front of the Church are also
in three shot sequence from left to right showing the entire building
including the Chapel. New walls being built around the HVAC unit next to the
basement entrance. |
 |
OLG
August 21, 2010 Update |
Roof over entrance to the Church is ready for completion,
bell tower structure is nearing completion, steel studs continue to be
installed in preparation for Dry wall and stone facia is being put in palace
in front of Church entrance and along walls facing Cold Spring Creamery
Road. HVAC units have been installed on respective pads. Ceiling inside
entrance and Narthex has been installed. |
 |
OLG
August 15, 2010 Update |
Progress is being made throughout the development site: turn
lanes from Cold Spring Creamery Road have been installed, steel studs are
being installed for dry wall installation, wood beams are nearing completion
and exterior brick work is moving along. In the basement, the HVAC ducts
have been installed and the electric panels are in place. |
 |
OLG
August 6, 2010 Update |
Examples of stone and brick exterior material. Construction
of roof has begun with the instillation of the mahogany wood beams. Photos
taken from Altar area as well as the entrance to the Church from the
Narthex. Panorama of the Church gives an indication of the size and scale of
the entire building. Panorama view from the Altar and entrance gives an
indication of what the entry into the Church will look like. Stone work on
the exterior also has begun. |
 |
OLG July
31, 2010 Update |
Additional steel work being completed. New steel
structures forming the entrance of the Church and along both sides of
the building. Steel ceiling being added to bathroom areas and rooms off
to the side. Plumbing is in place for bathrooms. View from entrance to
Narthex toward where the altar will be installed. |
 |
OLG July
24, 2010 Update |
Church building steel framework nearing completion. Views
from several angles around perimeter of show extent of work being done. |
 |
OLG July
22, 2010 Update |
Installation of the steel superstructure is moving along
quite quickly now. Area where cupola will be installed is almost
complete. Preparation for the stone facade is underway. Views from the
parking area and Cold Spring Creamery Road show size and scale of Church
building. |
 |
OLG July 17, 2010 Update |
Walls have been built along entrance to Narthex and
adjoining area along the perimeter of the Church. Concrete pads for the
columns in front of the Church are now in place. The concrete slab in
main area of the Church has bee poured and new steel has been brought to
the site. The crane used to install the steel is being assembled and
steel girders and beams will be installed next week. HVAC ducts in the
basement are ready for installation. |
 |
OLG July 7, 2010 Update |
Construction of Church is rapidly showing progress. Walls
on both sides of building are nearing completion and size and scale of
entire building is becoming more apparent. New steel construction should
begin this coming week which will give even greater idea of what Church
building will look like. Area over HVAC has been graded and grid laid
for concrete pad which should be poured next week. |
 |
OLG New Chapel |
You can save these photos after viewing them by creating
a free Kodak Gallery account. |
 |
OLG June
29, 2010 - UPDATE |
Progress continues at the Church building site with the
block walls being erected on both sides of the building, back filling
around HVAC ducts and grading in preparation for the concrete slab floor
of the Church. Footings are in place for the Church entrance and steel
should begin to be installed within the next two weeks. Grading and
gravel bed in the parking lots are nearing completion, as is the
landscaping. Overhead view shows the outline of the Church and Chapel
more clearly since the grading continues and the block walls are being
erected. |
 |
OLG June
19, 2010 - UPDATE |
Landscaping is nearing completion around parking area as
well as along the open space. Grading around foundation front and
rear of the Church building is being completed. As soon as the
installation of the HVAC conduits is completed the area within the
Church foundation will be graded in preparation for the concrete
foundation to be poured. The walls of the Church in the area of the
Narthex are being constructed, connecting with the walls to the right of
the entrance to the Narthex that have been visible in previous photos. |
 |
OLG June
10, 2010 - UPDATE |
Cement has been poured for flooring over basement in
Nathex. Landscaping is being installed throughout the property. Back
fill around basement walls is in progress and grading in preparation for
the concrete slab for the Church is nearing completion. |
 |
OLG June 5, 2010 - UPDATE |
Steel floor is completed and awaiting concrete to be
applied this coming week. Landscaping is being done along walkway on
Cold Spring Creamery Road. Concrete path has been laid between parking
areas. |
 |
OLG May 26, 2010 -
Day 3 UPDATE |
Steel floor is nearing completion over the basement.
Concrete will be applied if the weather cooperates. |
|
|
OLG Church Steel
Installation Day 2 May 26, 2010 |
Beams in place over front entrance, floor beams installed
and ready for flooring. Basement views show HVAC units installed on
pads. Conduits for HVAC in process of being placed underground. Water
resistant shield completed around entire exterior basement walls.
In background workmen are grading and preparing parking areas for some
concrete walkways and asphalt |
|
 |
OLG Church Steel Installation
May 25, 2010
|
This is the beginning of the installation of the steel
inside and above the basement. The formation of the entry way to the
Church can now be visualized. These photos were taken between 10 AM and
noon on May 25. The steel installation will continue this afternoon and
for the next two days. In addition, the work continues in many other
areas of the site, as can be seen throughout the photos. These
photos show the installation of the beams in the basement area creating
the floor area where we will enter the Church into the Narthex. |
OLG Church Construction Site May 22, 2010 |
OLG Church Construction Site May 14, 2010 |
OLG Church Construction Site May 8, 2010 |
OLG Church Construction Site April 29, 2010 |
OLG Church Construction Site April 18, 2010 |
OLG Town Hall Meeting April 11, 2010 |
OLG Easter Vigil 2010 |
OLG Easter 2010 Altar Decorations |
|
OLG Church Construction Site April 3, 2010 |
|
OLG Church Construction Site March 7, 2010 |
|
Christmas 2009 Altar Decorations |
Our Lady of Guadalupe Feast Day Dec 12, 2009 |
Thanksgiving Mass Nov 2009 |
|
OLG - Long Awaited Update - November 21, 2009 |
|
OLG - Humble Beginnings at Hollyberry Square |
|
Youth Group - Haunted Hay Ride - November 1, 2009 |
Youth Group - Pumpkin Decorating Contest - October 11, 2009 |
OLG Chapel - First Benediction - October 2, 2009 |
|

OLG UPDATE - September 17, 2009. Excavation of Church Basement |
|

OLG UPDATE - September 11, 2009. Removal Of The Farmhouse |
|

OLG UPDATE - August 18, 2009 |
|


Construction Begins On Our Parish |
First Mass at OLG Chapel |
|

First Baptism On Our New Site |
|


Fr. Gentili's Installation July 17, 2009 |